CHCG Case Study
Scaling a Patient Access Transformation: Decentralized Patient Support Technology Adoption
Following measurable gains in Centralized Patient Scheduling, a large academic health system expanded CH Consulting Group’s engagement into decentralized patient support, the operation carrying its largest share of procedural volume and revenue. CHCG delivered a seven-workstream technology and governance program across 17 surgical and procedural service lines, replacing fragmented workflows with standardized routing, workforce visibility, quality monitoring, and documented operational controls.
17 Service Lines
Individual phone workflows replaced with standardized surgical and procedural patient support routing.
4 Workstreams Complete
Telephony, workforce management, quality monitoring, and business requirements reached 100% completion.
45 Coordinators Across 9 Teams
Scale of the decentralized patient support operation at engagement close.
CASE STUDY DETAILS
Project Summary:
CH Consulting Group was initially engaged by a large academic health system to provide interim leadership and conduct an operational assessment of Centralized Patient Scheduling. That first phase stabilized the operation and delivered measurable gains in service level, speed of answer, and schedule adherence, documented in the earlier case study, Transforming the Patient Access Center.
On the strength of those results, the health system expanded the engagement into decentralized patient support. This second phase ran from November 2025 through August 2026 and covered seven workstreams across 17 surgical and procedural service lines.
Leadership signaled that surgical volumes could roughly double. Meeting that demand required standardized work, workforce visibility, and quality infrastructure so every additional case could move through a system equipped to absorb it.
Key focus areas included:
Standardizing technology and workflows across 17 surgical and procedural service lines.
Establishing workforce visibility, quality monitoring, and consistent patient messaging.
Embedding standard work, training, and governance to sustain adoption and support growth.
CASE STUDY DETAILS
Project Challenges:
- Fragmented phone workflows across 17 service lines, with no standardized routing.
- Manual workforce management with no reliable schedule-adherence visibility.
- No enterprise call recording, quality scoring, or coaching framework.
- Inconsistent patient messaging and outreach across service lines.
- Configuration changes without formal documentation or an audit trail.
- Job-shadow onboarding requiring six to nine months to reach full proficiency.
- Limited cross-training, leaving several service lines dependent on a single coordinator.
PLAN OF ACTION
Project Solution:
CH Consulting Group delivered a seven-workstream technology and governance program across 17 surgical and procedural service lines. The work standardized phone routing, activated workforce management and quality monitoring, introduced consistent patient messaging, and built real-time operational dashboards. Nine Business Requirements Documents, ticketed change control, documented standard work, and coordinator training established the governance and operational practices needed to sustain adoption and support growth.
THE OUTCOME
1. Project Results
Technology Adoption and Operational Visibility
CHCG moved decentralized patient support from fragmented, manually managed workflows onto integrated platforms, giving coordinators standardized tools and leaders visibility into daily operations.
- Standardized Cisco UCCX/Finesse routing across 17 surgical and procedural service lines.
- Activated Calabrio WFM with Akkadian Labs for scheduling, adherence tracking, and exception management.
- Enabled Calabrio QM call recording and full screen capture, establishing a foundation for AI-assisted scoring on HIPAA language and scripting adherence.
- Standardized patient outreach through phased Artera messaging adoption.
- Built real-time Power BI dashboards for adherence, contact volume, and scheduling activity.
THE OUTCOME
2. Project Results
Program Completion and Sustainable Operations
Four workstreams reached full completion. Documented requirements, standard work, and training established operational capabilities that stay with the organization through staffing changes.
- Cisco UCCX/Finesse, Calabrio WFM and Akkadian Labs, Calabrio QM, and Business Requirements reached 100% completion.
- Artera reached 95% and dashboards reached 85%, with phased rollout continuing.
- Closed nine Business Requirements Documents and moved subsequent configuration changes to ticketed change control.
- Reframed onboarding from a six-to-nine-month job-shadow ramp toward a documented 30-business-day certification path.
- Documented standard work, identified cross-training opportunities, and established service-line super users.
- Delivered a Stabilization, Expansion, and Optimization roadmap with recommended owners and a 30/60/90-day check-in cadence.
- Internal referrals increased by 25%, representing an estimated $100M annual top-line opportunity